
Windfarm implantation project totalling 8 wind turbine in MERIE and MORSIGLIA (Northem Corsica).
Worried about the environment respect, a technician from ALIOS, makes sure that the place where soundings have been realised, stays clean.

Wind park of Méria (Corsica) : Destructives drilling on the implantation zone of the windmill N° 3.

Destructives drilling dropped at 20.0 m down with drilling’s parameters recording to permit the achievement of the pressuremeter tests according to the NF P 94.110-1 norm.

Wind park of Bialogard (Polska) : pressuremeter tests per drilling to measure the foundations parameters size (creep pressure, limit pressure and pressuremeter module).

Taza - Morocco : geological recognition drilling executed with a backhoe loader to see the constitution and the settling of superficial grounds and to remove representative samples of soils in place.

Wind park of Longuyon: Drill set up for the drillings realisation as a result of a G12 mission (Geotechnical report – draft version).

Longuyon : Realisation of calibrated drillings with drilling’s parameters recording.

Salles de Villefagnan : 9 Wind turbines Park. Here the foundation of one of the wind turbine.

Salles de Villefagnan : Destructive drillings